×
Register an Account
Forgot Login?
Construction Electrician Calls
Apr 30, 2025

Construction Electrician Calls

Daily Check In 7:30A.M.-9:00A.M.

Book Signing is in person only from 7:30A.M.-4:30P.M.

( Hall closed 12:30P.M. - 1:30P.M.)

Re-signs 10th through the 16th  7:30A.M. - 4:30P.M.

**For Good Guy Letters please email office@ibewlocal666.com with the local you are traveling to and any additional information they need**

Check your book status and pay dues here https://ibew666.workingsystems.com/

Brothers and Sisters,

International Policy on Organizing

As of today 

Persons on CE1 Book - 23

Persons on CE2 Book - 10

Persons on CE3 Book  - 31

The last line number to sign Book CE3 was 1127

The last line number to take a call was 152 on April 24th, 2025

 Calls forThursday, May 1st, 2025 

*** All Calls require Drug Test and I-9 Verification***

Contractor  Jobsite Duration  Number Classification  Comments 
1 Chewning & Wilmer Chirisa Regular Call 2 CE

Working 4-10's & an 8. Possible Saturdays. 7am start time. Drug Test. Orientation at pre-fab.

2 Miller Electric Pre-Fab Regular Call 3 CE

Working 5 - 10s and an 8. Report to prefab shop 5/5/25 7am Drug test required

3 Miller Electric QTC RIC3 DC1 Regular Call 10 CE Working 5 - 10s and 8, spotty Sundays, report to prefab Monday 5/5/25 7am Drug test required 
4 Miller Electric QTC RIC3 DC2 Regular Call 10 CE Working 5 - 10s and 8, spotty Sundays, report to prefab Wednesday 5/7/25 7am Drug test required
5
6

-
IBEW Local 666
1400 E. Nine Mile Rd.
Highland Springs, VA 23075
  (804) 353-9666

Top of Page image
Powered By UnionActive - Copyright © 2025. All Rights Reserved.